Construction of a Prefabricated Modular Building for a Thermal Disinfection and Decontamination Station for Pathogenicity Groups III–IV Effluents

22.10.2020

Customer: OOO «Sistema-BioTech» / AFK «Sistema»

Execution of design work on the repair and equipping of engineering systems and equipment of existing premises located on the 5th floor of building 11 of the Technopark "MOSMEDPARK" to accommodate the innovative biotechnological R&D laboratory of Sistema-BioTech LLC.

The contract for the implementation of design work for the repair and equipping of engineering systems with equipment of existing premises within the framework of this project with Sistema-BioTech LLC was concluded at the beginning of April 2020. On May 1, INEX specialists began work that continued over the summer months.

By the beginning of October 2020, the installation of the ventilation system was completed at the facility. Air handling units, air duct routes, air distribution units were assembled. On October 7, a meeting with the customer was held at the site on the design project of the office area, as well as on the placement of medical furniture and equipment. Since mid-October, the facility has been installing cleanroom structures. Several demonstration rooms have been completely assembled.

Work at the facility continues.